The Supreme Court cut the damages awarded to a builder who fell into an empty swimming pool in Paralimni from 63,000 euros to 45,000 euros, ruling the original award manifestly excessive. It upheld findings that his employer was negligent for failing to fence off or cover the pool, but also that the builder was 30 per cent to blame.
The accident happened on 2 April 2008, when the builder, then 62, was working on a building under construction. According to the facts accepted by the court, he and an assistant had covered the floor with plastic sheeting and used a demolition tool to remove a bulge in a wall next to the empty pool.
As he walked towards a wheelbarrow to fetch boards to protect the wall, he slipped, lost his balance and, after a few steps, fell into the pool, which was about 1.5 metres deep.
He tore the anterior cruciate and medial collateral ligaments and the meniscus in his left knee. He had keyhole surgery to clean the meniscus, followed by physiotherapy, but the torn ligaments left his knee permanently unstable. Surgery to repair the ligaments was not considered advisable because of his age.
The case
Famagusta District Court had found that the employer failed to take the necessary measures, such as railings or a cover, to stop workers falling into the open pool. It found the builder 30 per cent contributorily negligent, as an experienced builder who knew the pool was empty.
The company appealed against the finding of liability, its share of the blame and the amount of damages. It argued that the builder had created the danger himself by laying the plastic sheeting, which made the floor slippery, and that a safer route had been available. The builder cross-appealed, arguing that he should not have been found negligent at all.
In a unanimous ruling, judges Stamatiou, Dimitriadou-Andreou and David rejected the company’s arguments on negligence. Employers must provide a safe place and system of work and take reasonable measures to protect their workers, they said. The open, empty pool, about 1.5 metres from where the builder was working, posed an obvious and foreseeable risk, and railings or a cover would have been a reasonable precaution that could have prevented the accident.
According to the ruling, an employer’s duty of safety also includes anticipating possible carelessness or errors of judgment by workers. The judges noted that the company had produced no evidence of the safety measures taken or of any system of work used on the site.
The court nonetheless upheld the 30 per cent contributory negligence. The builder was experienced, knew the pool was empty and was aware of how narrow the route was and of the added risk of slipping on the plastic sheeting, the judges said. Although he had not been formally appointed as foreman, he was in practice responsible for organising the work, with another worker under him, and should have taken more care and used the safer route, even if it took longer, they found.
Damages
In setting the new amount, the court took into account the seriousness of the injuries, the permanent instability of the knee and the effect on the builder’s daily life, while finding the 63,000 euros awarded for pain and suffering was not justified by the facts.
He returned to work six months after the accident, but could only do lighter manual work, and was no longer able to do things such as walking on rough ground or hunting. According to the medical evidence, his knee condition could speed up the onset of osteoarthritis and, at an advanced stage, require a total knee replacement.
The court awarded 45,000 euros on the basis of full liability. The 30 per cent for the builder’s contributory negligence will be deducted, and legal interest will be paid from the date of the accident until payment. The other damages awarded at first instance, 3,917.82 euros for medical costs and 7,906.62 euros for lost wages until his return to work, were unchanged.
The company’s appeal was allowed only on the amount of general damages. Its other grounds of appeal and the builder’s cross-appeal were dismissed. The court awarded costs of 3,000 euros, plus VAT if applicable, to the company against the builder.