Owners of energy-hungry commercial buildings may have to upgrade them even without a planned renovation, under a Cabinet-approved bill on the energy performance of buildings. The bill also sets deadlines for installing solar systems and raises the maximum administrative fine fivefold, from 50,000 to 250,000 euros.
The bill was approved on August 6, 2026. It would replace the 2006 to 2020 legislation and bring EU Directive 2024/1275 into national law. Its main change is to set specific targets and timetables for existing buildings, while new buildings move to a zero-emission standard. It would also require an energy certificate when a lease is renewed, and it tightens rules on electric vehicle charging.
The rules would not all apply at once. If the bill passes unchanged, some obligations will be tied to the construction, renovation, or sale or rental of a property, while others will be phased in. A number of technical details will be set by decrees and implementing measures.
Offices and shops
Existing non-residential buildings, such as offices and shops, will have to meet minimum energy performance standards set by ministerial decree. Thresholds marking out the worst performers will be based on the building stock as of January 1, 2020. From 2030, buildings must meet the threshold for the worst-performing 16 per cent, and from 2033 the threshold for the worst 26 per cent.
The percentages are not a requirement for every building to make the same savings. The work needed will depend on each building’s performance and the threshold it has to meet. Exemptions are possible, including for serious difficulties or an unfavourable cost-benefit analysis. Where a full renovation is not cost-effective, at least the individual measures with a favourable cost-benefit ratio will be required.
Solar deadlines
The bill sets a detailed timetable for installing solar energy systems, where these are technically suitable and economically and functionally feasible. New public and non-residential buildings over 250 square metres face a deadline of the end of 2026.
For existing public buildings, the deadline depends on size. Buildings over 2,000 square metres must comply by the end of 2027, those over 750 square metres by the end of 2028, and those over 250 square metres by the end of 2030.
Existing non-residential buildings over 500 square metres face an end-2027 deadline in specified cases of major renovation or works requiring a building permit. All new residential buildings, along with new covered car parks next to buildings, are included by the end of 2029. There is no equivalent blanket obligation for existing homes.
Homes
For houses and flats, the bill takes a different approach. It aims to cut average primary energy use across the housing stock by at least 16 per cent by 2030 and by 20 to 22 per cent by 2035, compared with 2020. Owners will not each face the same percentage cut, nor a blanket obligation to renovate by 2030. The competent authority will set the national path and the measures to reach the targets.
The least efficient homes take priority. At least 55 per cent of the savings must come from renovating the worst-performing 43 per cent of homes, although not all of those homes will have to be renovated by 2030. Upgrade requirements will continue to apply during major renovations or when parts of the building envelope are replaced, subject to technical, functional and economic feasibility.
Certificates and rentals
Besides construction, sale and new lettings, energy performance certificates will also be required for major renovations. No new certificate will be needed where a valid one already exists. Certificates will remain valid for a maximum of ten years, and they will be issued digitally and recorded in a national database.
Property advertisements will have to show the energy performance indicator and class. The scale will run from A to G, with A reserved for zero-emission buildings. A low rating will not in itself bar a property from being sold or rented.
Zero-emission new buildings
New buildings will move from the nearly zero-energy standard to zero emissions. The new standard will apply from January 1, 2028 to new buildings owned by public bodies, and from January 1, 2030 to all new buildings.
These buildings must produce no on-site carbon emissions from fossil fuels. Their permitted energy demand must be at least 10 per cent below the nearly zero-energy limit in force on May 28, 2024. The date of the building permit application will be decisive, because applications filed before the relevant deadlines are exempt.
A new requirement to calculate the climate footprint of a building’s whole life cycle will start in 2028 for new buildings over 1,000 square metres and in 2030 for all new buildings, with exemptions for earlier permit applications. The results will be published through the energy performance certificate.
Charging points and boilers
New non-residential buildings and major renovations with more than five parking spaces will need at least one charging point for every five spaces. At offices, the ratio rises to one for every two spaces. Pre-cabling and bicycle parking requirements are also added. New residential buildings with more than three parking spaces will need at least one charging point, subject to specific conditions and exemptions.
Replacement policies aim to phase out stand-alone fossil fuel boilers completely by 2040. Existing installations will not have to be removed immediately once the law is passed.
Support and penalties
The framework includes financial and technical support, with priority for vulnerable households. It also provides for a one-stop shop and a voluntary ‘renovation pathway’ with tailored planning of works. Safeguards for tenants are included, but the bill sets no specific grant amounts and no single cap on rent increases. These will be set out in later measures.
Fines will depend on the nature and seriousness of the breach, with a right to make representations and to appeal. Existing regulations will stay in force until they are amended, replaced or repealed.




