Erosion threatens Oroklini promenade as experts warn of beach threat (photos)

Relevant News

Sections of Oroklini’s busy coastal promenade have become dangerous due to erosion-related ground subsidence, with part of the walkway developing a hazardous tilt and one point featuring a large crack that has made it inaccessible.

The affected stretch runs from the central outdoor exercise area to the hotels in the region, where local authorities have placed cones and tape at the most problematic points.

Larnaca Municipality has called foreign experts to Cyprus who have submitted proposals to tackle the erosion that has already “eaten away” the beach and now threatens the entire promenade and hotel green spaces.

Neofytos Fakontis, deputy mayor of Oroklini, said there is a dangerous tilt in part of the promenade built 20 years ago that requires full dismantling and reconstruction, which will take several months.

However, he was reassuring about citizen safety. Measures have been taken at problem points for temporary passage of the public, who are not at risk when walking in the area, he said.

According to specialists, there is no need to close the promenade, though if greater erosion is observed, other measures will be taken, the deputy mayor added.

Two professors from Democritus University of Thrace and a French company specialising in creating sea barriers to limit erosion and recover beaches conducted studies to determine the scale of the problem, according to Fakontis.

According to the preliminary assessment of the foreign experts, it appears the breakwaters were not placed correctly, which caused this erosion in the hotel area, the deputy mayor said.

In cooperation with competent state services, Larnaca Municipality is expected to invite tenders for reconstruction of the specific section of the coastal promenade, which falls under Town Planning Works.

The second phase of Oroklini’s coastal promenade was completed in 2017, whilst the third phase has been on hold for six years. This phase, which will increase the promenade by 1.3 kilometres from the Lebay hotel to the Marsellou building, is expected to cost over €4 million.

The Town Planning Department has approved the updated plans for the extension, however the issue had until recently been stuck on objections from a private individual who allegedly made an illegal extension of his property in the Beach Protection Zone.

Follow en.philenews on Google News and be the first to know all the news about Cyprus and the world.