EAC continues smart metre installations across Cyprus in May

Relevant News

The Electricity Authority of Cyprus (EAC) has announced that during May, it will continue the deployment of smart meters across all EAC regions, expanding to additional areas beyond those mentioned in previous announcements.

The installations will take place in these specific locations:

Nicosia: The area between Stasinou Avenue up to the Green Line, from Orpheas Stadium to Paphos Gate (within the walls)

Limassol: Germasogeia-Mouttagiakka area, north of the Limassol-Nicosia road from Agios Athanasios Industrial Area to Agios Tychon

Larnaca: Vergina area, Zenon Housing Estate and Kamares II Housing Estate, south of Dr. Vassos Lyssarides Avenue at the level of Kamares

Paralimni: Along Kapparis Avenue from Agia Triada roundabout to Yiorkis Papadopoulos Street, and part of the area near Archbishop Makarios III Street, north of the old Paralimni Stadium

Paphos: The area between Kato Pervolia Street, Apostolou Pavlou, Gladstonos, Nikodemou Mylona, Evagora Pallikaridi, Thermopylon, Fellachoglou and Aphrodite Streets

The EAC reminds customers that safe meter replacement requires a power interruption not expected to exceed 20 minutes.

Read more:

Follow en.philenews on Google News and be the first to know all the news about Cyprus and the world.